Home
LOCATION
Residenza Pitagora
Visit the Units
Block A
Block B
Photogallery
News
W.I.P.
DOCUMENTS
INFORMATION
English
Italiano
Work In Progress
FORMWORK, REINFORCING STEEL AND INSTALLATIONS OF THE BLOCK A THIRD FLOOR SLAB + INTERIOR BRICK WALL AND DOOR COUNTERFRAMES ON THE SECOND FLOOR OF THE BLOCK B
by
ga
·
June 15, 2018
·
in
WIP
·
0 comments
15.06.2018
Read More
FORMWORK OF THE BLOCK A THIRD FLOOR SLAB + INTERIOR BRICK WALL AND DOOR COUNTERFRAMES ON THE SECOND FLOOR OF THE BLOCK B
by
ga
·
June 08, 2018
·
in
WIP
·
0 comments
08.06.2018
Read More
INTERIOR BRICK WALL AND DOOR COUNTERFRAMES ON THE SECOND FLOOR OF THE BLOCK B + LOAD-BEARING BRICK WALL AND CONCRETE OF THE BLOCK A SECOND FLOOR VERTICAL STRUCTURES
by
ga
·
June 01, 2018
·
in
WIP
·
0 comments
01.06.2018
Read More
INTERIOR BRICK WALL AND DOOR COUNTERFRAMES ON THE GROUND FLOOR OF THE BLOCK B + LOAD-BEARING BRICK WALL AND CONCRETE OF THE BLOCK A SECOND FLOOR VERTICAL STRUCTURES
by
ga
·
May 25, 2018
·
in
WIP
·
0 comments
25.05.2018
Read More
FORMWORK AND REINFORCING STEEL OF THE BLOCK A SECOND FLOOR VERTICAL STRUCTURES + INTERIOR BRICK WALLS ON THE GROUND FLOOR OF THE BLOCK B
by
ga
·
May 18, 2018
·
in
WIP
·
0 comments
18.05.2018
Read More
1
2
3
4
5
6
7
8
9
10
11